Ameren UE Calloway Plant

Project

AmerenUE Weather Protection

Location

Calloway Nuclear Plant Fulton, MO

Organization

AmerenUE

Facility Type

Outage Support

Kelly Buildings were used for storage of materials during an outage so materials could be close to work area. Buildings needed to be mounted on top of an existing concrete structure. Buildings were sub-assembled on the ground and lifted into place to reduce assembly time.

US Navy Cherry Point

Project

US Navy Cherry Point MCAS Grow the Force Comm Bldg

Location

Cherry Point, NC

Organization

US Navy

Facility Type

Communications Office/Shop

This 48’W x 180’L x 16’ Eave building was supplied to NAVFAC as government furnished equipment and erected by a local contractor in a two week timeframe. Kelly Klosure was selected for the project because of our short manufacturing cycle, our commitment to on-time delivery, and our field service after the sale. The project had strict deadlines for the completion of the overall project due to the scheduled arrival of marines.

FPL Duane Arnold Fab Shop

Project

Fabrication Shop

Location

Palo, IA

Organization

FPL

Facility Type

Fabrication Shop

Provided a 33’ wide x 111’ long x 10’ eave height building for a fabrication shop at Duane Arnold Energy Center in Iowa. The building was erected in seven days by on-site maintenance workers using an existing concrete slab for a foundation. Kelly’s unique structure provided many locations for attaching interior lighting, heaters, and power connections.

USCBP Mobile VACIS Temp Ops

Project

Mobile VACIS Temporary Ops Facilities

Locations

Alexandria Bay, NY; Port Huron, MI; Houlton, ME; Calais, ME; Highgate Springs, VT; International Falls, MN; Sumas, WA

Organization

GSA Public Buildings Service / US Customs & Border Protection

Facility Type

Cargo Screening & Inspection

Provided turn-key design-build services for these facilities. Project duration: 4 weeks for each facility, many in progress simultaneously. Facility consists of Kelly Klosure building, inspector’s booth, ventilation, radiant heat system, and electrical. The unique Kelly Klosure building allowed many of the facilities to be placed on existing asphalt paving without the need for extensive foundation systems.

BATF Explosives Training

Project

Explosives Training Facility

Location

Ft. A P Hill, Virginia

Organization

Bureau of A.T.F.

Facility Type

Classroom

Provided turn-key design-build services for this facility. Facility consists of Kelly Klosure buildings on a concrete foundation, relocatable service module, 2 classrooms with acoustical treatment, break area, workstation rooms, front pavilion, electrical, HVAC, and plumbing.

US Army Reserve Fort Dix

Project

Fort Dix Classroom Building

Location

Fort Dix, New Jersey

Organization

US Army Reserve

Facility Type

Classroom Building

This classroom building was constructed and finished out in a two week training period by military personnel. The building shell (42’W x 81’L x 10’ Eave) was erected in five days utilizing small equipment and hand tools. The classroom buildings were intended to be easily expanded in the future. Since the Kelly building panels are interchangeable this also allowed for easy changing of locations for windows and personnel doors on the site during installation.
 

Fort Bragg Admin Buildings

Project

Fort Bragg Administration Offices

Location

Ft. Bragg, North Carolina

Organization

Futron, Inc.

Facility Type

2-Story Offices

Provide 5 two-story and 1 single-story building shells and 5 mezzanine structures to be installed and finished by Futron, Inc., a MAC contractor at Ft. Bragg. The order was received on February 10th, 2006, the last building and mezzanine shipped April 21st, 2006 a total of 10 weeks from receipt of order. The quick delivery schedule of the buildings and mezzanines and the speed of assembly of Kelly buildings and mezzanines allowed Futron to finish the project on time for the June 1st , 2006 deadline.

NAVAIR Simulator Building

Project

US Navy (NAVAIR) Simulator Building

Location

Okinawa, Japan

Organization

US Navy

Facility Type

Simulator Enclosure

This 42’w x 42’l x 23’ eave building was designed to withstand up to 180 MPH wind load. Steel framework was hot dip galvanized to resist corrosion in the ocean air. The building was erected by a local Japanese contractor in five days.

Fort Carson SMDC Vehicle MaintenFort Carson SMDC Vehicle Maintenance

Project

Vehicle Maintenance Facility

Location

Colorado Springs, CO

Organization

US Army / Inuit-KAYA Technical Services

Facility Type

Shop & Office

Provided turn-key design-build services for this facility. The vehicle maintenance facility was designed with a mezzanine level to allow for office space above a tool room, mechanical room, and restrooms. Shop area was supplied with radiant heat and ventilation. Building system allows for the addition of future drive-through bays.

UA Brigade Facilities Temporary Fire Station

Project

UA Brigade Facilities Temporary Fire Station

Location

Fort Riley, Kansas

Organization

Alutiiq, LLC / US Army

Facility Type

Emergency Response

Provided turn-key design-build services for this facility. Facility consists of Kelly Klosure buildings on a concrete foundation, offices, bunk rooms, apparatus bay, restrooms/showers, equipment decontamination area, anti-terrorism windows & doors, HVAC, fire sprinkler & alarm systems, electrical. The building shell was erected in 10 working days. Because of the nature of the need, the building is designed to meet the Army’s requirements for a re-locatable facility. No more than 20% of the building cost can be left behind in relocation.

99th RRC Storage Building

Project

Maintenance & Storage Facility

Location

Letterkenny, Pennsylvania

Organization

US Army Reserve 99th RRC

Facility Type

Maintenance & Storage

Provided turn-key design-build services for this facility. Total project duration was only 4 weeks. Facility consists of Kelly Klosure System 2 building on a concrete foundation, with electrical and heating systems.

USCBP Mariposa CIF

Project

Drug Screening Facility

Location

Nogales, AZ

Organization

GSA Public Buildings Service / US Customs & Border Protection

Facility Type

Cargo Screening & Inspection

Provided design-build services for this facility. Project duration: 3 months. Facility consists of Kelly Klosure building on a concrete foundation, interior inspection platforms, elevated office, ventilation, and electrical.

Picatinny Arsenal Joint Armaments Center

Project

Flat Roof Clean Room

Location

Picatinny Arsenal, New Jersey

Organization

US Army

Facility Type

Shop / Clean Room

Provided turn-key design-build services for this facility under Kelly Klosure’s GSA Schedule contract.  Facility was installed on a loading dock below a canopy sheeted with asbestos containing material.  Shop included a compressor room and was supplied with HVAC and electrical lighting and outlets for fabrication equipment.