OPPD purchased the 11’2”W x 22’2”L x 8’/10’H Single Slope Kelly Klosure building to replace an aging structure that was no longer providing adequate protection for the electrical equipment it housed. The building was designed to handle the challenging environment and to fit into the unique space. Kelly’s pre-framed panelized building system also allowed for fast installation – reducing the time the electrical equipment was exposed to the elements.
![]() | ![]() |
![]() | ![]() |
Provided turn-key design-build services for this facility. Project duration was 6 weeks. This was a 60’ addition to an existing Kelly Klosure building. Facility consists of Kelly Klosure building on a concrete foundation, with HVAC, fire sprinkler, and electrical systems.
![]() | ![]() |
![]() |
Provide walkway and canopy as part of a new security checkpoint at Pittsburgh International Airport. Quick delivery and ease of assembly allowed the project to be complete before the Thanksgiving weekend rush. The completed project lowered the average wait for passengers from 47 minutes to only 15.
![]() | ![]() |
![]() |
Provided turn-key design-build services for this facility. Project duration was 6 weeks. This was a 60’ addition to an existing Kelly Klosure building. Facility consists of Kelly Klosure building on a concrete foundation, with HVAC, fire sprinkler, and electrical systems.
![]() | ![]() |
![]() |
Design, engineer and manufacture a reusable enclosure to cover the aircraft launch catapults on the carrier deck during repairs. These units need to be watertight when installed and need to store efficiently without disassembly when not in use. The 30’-0” long units are design to lap over each other to create a watertight enclosure when installed. They have casters to ease movement on the aircraft deck. When not in use, the individual sections are designed to stack on top of each other up to 6 high.
![]() | ![]() |
![]() |
Kelly Klosure building was designed to be crane lifted and re-located multiple times. Ladders and two levels of interior catwalks were also provided. All bolt together construction and panelized design made it simple for on-site maintenance personnel to assemble the enclosure. Light transmitting panels in the walls and roof allowed for natural light within the building.
![]() | ![]() |
![]() | ![]() |
Kelly Klosure buildings were used for storage of materials during an outage so materials could be close to work area. Buildings needed to be mounted on top of an existing concrete structure. Buildings were sub-assembled on the ground and lifted into place to reduce assembly time.
![]() | ![]() |
![]() | ![]() |
This 48’W x 180’L x 16’ Eave building was supplied to NAVFAC as government furnished equipment and erected by a local contractor in a two week timeframe. Kelly Klosure was selected for the project because of our short manufacturing cycle, our commitment to on-time delivery, and our field service after the sale. The project had strict deadlines for the completion of the overall project due to the scheduled arrival of Marines.
![]() | ![]() |
![]() |
Provided a 33’ wide x 111’ long x 10’ eave height building for a fabrication shop at Duane Arnold Energy Center in Iowa. The building was erected in seven days by on-site maintenance workers using an existing concrete slab for a foundation. Kelly’s unique structure provided many locations for attaching interior lighting, heaters, and power connections.
![]() | ![]() |
![]() |
Provided turn-key design-build services for these facilities. Project duration: 4 weeks for each facility, many in progress simultaneously. Facility consists of Kelly Klosure building, inspector’s booth, ventilation, radiant heat system, and electrical. The unique Kelly Klosure building allowed many of the facilities to be placed on existing asphalt paving without the need for extensive foundation systems.
![]() | ![]() |
![]() |
Provided turn-key design-build services for this facility. Facility consists of Kelly Klosure buildings on a concrete foundation, relocatable service module, 2 classrooms with acoustical treatment, break area, workstation rooms, front pavilion, electrical, HVAC, and plumbing.
![]() | ![]() |
![]() |
This classroom building was constructed and finished out in a two week training period by military personnel. The building shell (42’W x 81’L x 10’ Eave) was erected in five days utilizing small equipment and hand tools. The classroom buildings were intended to be easily expanded in the future. Since the Kelly building panels are interchangeable this also allowed for easy changing of locations for windows and personnel doors on the site during installation.
![]() | ![]() |
![]() |
Provide 5 two-story and 1 single-story building shells and 5 mezzanine structures to be installed and finished by Futron, Inc., a MAC contractor at Ft. Bragg. The order was received on February 10th, 2006, the last building and mezzanine shipped April 21st, 2006, a total of 10 weeks from receipt of order. The quick delivery schedule of the buildings and mezzanines and the speed of assembly of Kelly Klosure buildings and mezzanines allowed Futron to finish the project on time for the June 1st, 2006, deadline.
![]() | ![]() |
![]() |
This 42’w x 42’l x 23’ eave building was designed to withstand up to 180 MPH wind load. Steel framework was hot dip galvanized to resist corrosion in the ocean air. The building was erected by a local Japanese contractor in five days.
![]() | ![]() |
![]() |
Provided turn-key design-build services for this facility. The vehicle maintenance facility was designed with a mezzanine level to allow for office space above a tool room, mechanical room, and restrooms. Shop area was supplied with radiant heat and ventilation. Building system allows for the addition of future drive-through bays.
![]() | ![]() |
![]() |
Provided turn-key design-build services for this facility. Facility consists of Kelly Klosure buildings on a concrete foundation, offices, bunk rooms, apparatus bay, restrooms/showers, equipment decontamination area, anti-terrorism windows & doors, HVAC, fire sprinkler & alarm systems, electrical. The building shell was erected in 10 working days. Because of the nature of the need, the building is designed to meet the Army’s requirements for a relocatable facility. No more than 20% of the building cost can be left behind in relocation.
![]() | ![]() |
![]() |
Provided turn-key design-build services for this facility. Total project duration was only 4 weeks. Facility consists of Kelly Klosure System 2 building on a concrete foundation, with electrical and heating systems.
![]() | ![]() |
![]() |
Provided design-build services for this facility. Project duration: 3 months. Facility consists of Kelly Klosure building on a concrete foundation, interior inspection platforms, elevated office, ventilation, and electrical.
![]() | ![]() |
![]() |
Provided turn-key design-build services for this facility under Kelly Klosure’s GSA Schedule contract. Facility was installed on a loading dock below a canopy sheeted with asbestos containing material. Shop included a compressor room and was supplied with HVAC and electrical lighting and outlets for fabrication equipment.
![]() | ![]() |
![]() |
Kelly Klosure expanded metal panels were used to create a secure area inside the distribution center of a major department store chain for processing jewelry and other high value items. The ease of installation allowed the area to be created in a very short period of time and allowed the center to remain operating while the work proceeded. The client installed the panels with their own maintenance crew. The security zone was then outfitted with closed circuit cameras and magnetic keypad entry systems.
![]() | ![]() |
![]() | ![]() |
Provide walkway and canopy as part of a new security checkpoint at Pittsburgh International Airport. Quick delivery and ease of assembly allowed the project to be complete before the Thanksgiving weekend rush. The completed project lowered the average wait for passengers from 47 minutes to only 15.
![]() | ![]() |
![]() |
Kelly Klosure provided a rental of classic system weather protection with accessories for hi-rise construction. The enclosure was set up to encompass the entire perimeter of the building for three floors at one time. As interior finishes progressed the enclosure was moved up the exterior of the building. This allowed Weitz to continue work in winter conditions without worrying about blow-outs and fire hazards involved with using plastic sheeting.
![]() | ![]() |
![]() | ![]() |
OPPD purchased the 11’2”W x 22’2”L x 8’/10’H Single Slope Kelly Klosure building to replace an aging structure that was no longer providing adequate protection for the electrical equipment it housed. The building was designed to handle the challenging environment and to fit into the unique space. Kelly’s pre-framed panelized building system also allowed for fast installation – reducing the time the electrical equipment was exposed to the elements.
![]() | ![]() |
![]() | ![]() |
Provided turn-key design-build services for these facilities. Project duration: 4 weeks for each facility, many in progress simultaneously. Facility consists of Kelly Klosure building, inspector’s booth, ventilation, radiant heat system, and electrical. The unique Kelly Klosure building allowed many of the facilities to be placed on existing asphalt paving without the need for extensive foundation systems.
![]() | ![]() |
![]() |
Provided design-build services for this facility. Project duration: 3 months. Facility consists of Kelly Klosure building on a concrete foundation, interior inspection platforms, elevated office, ventilation, and electrical.
![]() | ![]() |
![]() |
Provided turn-key design-build services for these facilities. Project duration: 4 weeks for each facility, many in progress simultaneously. Facility consists of Kelly Klosure building, inspector’s booth, ventilation, radiant heat system, and electrical. The unique Kelly Klosure building allowed many of the facilities to be placed on existing asphalt paving without the need for extensive foundation systems.
![]() | ![]() |
![]() |
Provided turn-key design-build services for this facility. Facility consists of Kelly Klosure buildings on a concrete foundation, relocatable service module, 2 classrooms with acoustical treatment, break area, workstation rooms, front pavilion, electrical, HVAC, and plumbing.
![]() | ![]() |
![]() |
Provide 5 two-story and 1 single-story building shells and 5 mezzanine structures to be installed and finished by Futron, Inc., a MAC contractor at Ft. Bragg. The order was received on February 10th, 2006, the last building and mezzanine shipped April 21st, 2006 a total of 10 weeks from receipt of order. The quick delivery schedule of the buildings and mezzanines and the speed of assembly of Kelly buildings and mezzanines allowed Futron to finish the project on time for the June 1st , 2006 deadline.
![]() | ![]() |
![]() |
This 42’w x 42’l x 23’ eave building was designed to withstand up to 180 MPH wind load. Steel framework was hot dip galvanized to resist corrosion in the ocean air. The building was erected by a local Japanese contractor in five days.
![]() | ![]() |
![]() |
Design, engineer and manufacture a reusable enclosure to cover the aircraft launch catapults on the carrier deck during repairs. These units need to be watertight when installed and need to store efficiently without disassembly when not in use. The 30’-0” long units are design to lap over each other to create a watertight enclosure when installed. They have casters to ease movement on the aircraft deck. When not in use, the individual sections are designed to stack on top of each other up to 6 high.
![]() | ![]() |
![]() |
Provided turn-key design-build services for this facility. Facility consists of Kelly Klosure buildings on a concrete foundation, offices, bunk rooms, apparatus bay, restrooms/showers, equipment decontamination area, anti-terrorism windows & doors, HVAC, fire sprinkler & alarm systems, electrical. The building shell was erected in 10 working days. Because of the nature of the need, the building is designed to meet the Army’s requirements for a re-locatable facility. No more than 20% of the building cost can be left behind in relocation.
![]() | ![]() |
![]() |
Provided turn-key design-build services for this facility under Kelly Klosure’s GSA Schedule contract. Facility was installed on a loading dock below a canopy sheeted with asbestos containing material. Shop included a compressor room and was supplied with HVAC and electrical lighting and outlets for fabrication equipment.
![]() | ![]() |
![]() |
Provide 5 two-story and 1 single-story building shells and 5 mezzanine structures to be installed and finished by Futron, Inc., a MAC contractor at Ft. Bragg. The order was received on February 10th, 2006, the last building and mezzanine shipped April 21st, 2006 a total of 10 weeks from receipt of order. The quick delivery schedule of the buildings and mezzanines and the speed of assembly of Kelly buildings and mezzanines allowed Futron to finish the project on time for the June 1st , 2006 deadline.
![]() | ![]() |
![]() |
Kelly Buildings were used for storage of materials during an outage so materials could be close to work area. Buildings needed to be mounted on top of an existing concrete structure. Buildings were sub-assembled on the ground and lifted into place to reduce assembly time.
![]() | ![]() |
![]() | ![]() |
Kelly Klosure building was designed to be crane lifted and re-located multiple times. Ladders and two levels of interior catwalks were also provided. All bolt together construction and panelized design made it simple for on-site maintenance personnel to assemble the enclosure. Light transmitting panels in the walls and roof allowed for natural light within the building.
![]() | ![]() |
![]() | ![]() |
Kelly Klosure building was designed to be crane lifted and re-located multiple times. Ladders and two levels of interior catwalks were also provided. All bolt together construction and panelized design made it simple for on-site maintenance personnel to assemble the enclosure. Light transmitting panels in the walls and roof allowed for natural light within the building.
![]() | ![]() |
![]() | ![]() |
OPPD purchased the 11’2”W x 22’2”L x 8’/10’H Single Slope Kelly Klosure building to replace an aging structure that was no longer providing adequate protection for the electrical equipment it housed. The building was designed to handle the challenging environment and to fit into the unique space. Kelly’s pre-framed panelized building system also allowed for fast installation – reducing the time the electrical equipment was exposed to the elements.
![]() | ![]() |
![]() | ![]() |
Provided turn-key design-build services for this facility. Facility consists of Kelly Klosure buildings on a concrete foundation, relocatable service module, 2 classrooms with acoustical treatment, break area, workstation rooms, front pavilion, electrical, HVAC, and plumbing.
![]() | ![]() |
![]() |
Design, engineer and manufacture a reusable enclosure to cover the aircraft launch catapults on the carrier deck during repairs. These units need to be watertight when installed and need to store efficiently without disassembly when not in use. The 30’-0” long units are design to lap over each other to create a watertight enclosure when installed. They have casters to ease movement on the aircraft deck. When not in use, the individual sections are designed to stack on top of each other up to 6 high.
![]() | ![]() |
![]() |
Kelly Klosure building was designed to be crane lifted and re-located multiple times. Ladders and two levels of interior catwalks were also provided. All bolt together construction and panelized design made it simple for on-site maintenance personnel to assemble the enclosure. Light transmitting panels in the walls and roof allowed for natural light within the building.
![]() | ![]() |
![]() | ![]() |